New Yalu River Bridge Opens After 12-Year Delay Between China and North Korea
Four-lane crossing between Dandong and Sinuiju begins operations on 15 October with a joint ceremony; intended to replace the single-lane Friendship Bridge.

Dandong2 min read
Last updated
The New Yalu River Bridge linking Dandong in China's Liaoning province with Sinuiju in North Korea opens to traffic on 15 October, twelve years after construction finished. China's Xinhua News Agency reported the joint opening ceremony on 14 October. North Korean state media had not yet confirmed the plan at the time of the Chinese announcement.
The four-lane, approximately 3,026-metre dual-carriageway bridge was completed in 2014. China covered the construction cost of roughly 2.2 billion yuan. North Korea left approach roads and customs facilities unfinished for years amid strained relations, United Nations sanctions and the pandemic. Vehicles were observed on the structure in recent days, indicating preparatory test runs. Flags of both countries appeared at the North Korean gateway earlier in the week.
The new bridge is designed to become the primary road crossing and to ease pressure on the older Sino-Korean Friendship Bridge, a single-lane structure built in 1943 that also carries a railway. Chinese estimates suggest the new crossing can handle up to 20,000 vehicles and 50,000 passengers per day. Officials expect freight volumes between the two cities to rise substantially once full operations begin.
The opening follows a series of high-level contacts, including North Korean leader Kim Jong-un's visit to China and Chinese President Xi Jinping's trip to Pyongyang in June. It also comes weeks after North Korea and Russia opened a road bridge across the Tumen River. Trade between China and North Korea reached about 1.51 billion dollars in the first half of 2026, up 19.6 percent from the prior year, and full-year 2025 trade recovered to near pre-pandemic levels.
Sanctions continue to limit the range of goods that can move across the border. The bridge itself removes a long-standing infrastructure bottleneck rather than altering the legal framework for trade. Tourism visas for Chinese citizens have not yet resumed at scale. Still, the physical link restores a major land route that had stood idle since completion and supplies additional capacity for the limited commercial traffic that is permitted.
For border cities the practical effect will appear in shorter queues at the older crossing and higher daily vehicle counts once customs procedures are fully staffed on the North Korean side. The ceremony on 15 October marks the formal end of the twelve-year gap between construction and use.