Nepal’s flood dead reach 1,355 as nearly 5,000 remain missing
The National Disaster Risk Reduction and Management Authority is still searching eight districts after the 26 August ice-rock avalanche on the Nepal-Tibet border. Some 589 of the missing are foreign nationals. Monday was observed as a national day of mourning, the 13th day after the disaster.

Kathmandu3 min read
Last updated
Nepal’s confirmed death toll from the 26 August flash floods stood at 1,355 on Monday, with 4,996 people still unaccounted for, the National Disaster Risk Reduction and Management Authority said. A later same-day tally put the dead at 1,356 and the missing at 4,994, including 589 foreign nationals. Rescuers have brought 13,396 people out of the water and mud. More than 21,000 security personnel remain deployed across eight districts.
The flood began as an ice-rock avalanche near the Nepal-Tibet border and became a wall of water and debris down the Bhotekoshi and Trishuli corridors. Towns and hydropower camps in the north and centre of the country took the force. Chinese state media had earlier reported 16 dead and 546 missing on the Tibetan side. Combined, the event is one of the deadliest Himalayan disasters in years.
Where the bodies are
The authority’s district count on Monday listed 363 bodies in Chitwan, 222 in Nawalparasi East, 221 in Nawalparasi West, 197 in Nuwakot, 169 in Rasuwa, 75 in Gorkha, 70 in Dhading and 38 in Tanahu. Those eight numbers do not add to the national total because recoveries continue and some remains have not been assigned a district in the public sheet.
Identification is the second disaster. Many bodies were carried far downstream, damaged or decomposed. Hospitals put photographs on walls. Families arrived with other photographs. DNA collection has started because visual identification has failed in enough cases to stall funerals. Relatives who decided they could not wait any longer held symbolic rites at Pashupatinath, burning straw-and-barley effigies to “liberate” the souls of people who have not been found.
At least 900 of the missing were working on hydropower projects along the Trishuli. The army has said people remain trapped in tunnels and underground at the Trishuli-3 plant. Reconstruction of the Bhotekoshi corridor has been unofficially costed as high as $5 billion. That figure is a planning ceiling, not an appropriated budget.
A thirteenth-day mourning
The government declared 7 September a national day of mourning, the thirteenth day after the avalanche under Hindu funeral timekeeping. Flags flew at half-mast on government buildings and at missions abroad. President Ram Chandra Paudel asked parties to stop trading blame and to put their weight behind relief. Crews were still digging while the speeches were read.
The scientific file is separate and unfinished. Researchers are still reconstructing the chain from ice and rock on the border to the surge that hit the valleys. Climate attribution will come later, if it comes in a form that can be used. What is already usable is the human count and the hydropower exposure. Camps built in a river corridor took a night flood. The missing list is the result.
What remains open
Five thousand missing two weeks later is not a search that ends with a press conference. Some of those names will move to the dead column as DNA returns. Some will stay missing. Foreign ministries that have citizens on the 589 list will keep pressing Kathmandu for names and samples. Tourism officials will keep trying to ring-fence the rest of the country from the image of a vanished valley.
The immediate work is narrower. Recover, identify, bury, pay. The NDRRMA sheet will change again this week. Each change is a family that can stop standing in a hospital corridor with a printed photograph. Until that sheet stops moving, the disaster is still current, not historical, and the thirteenth-day mourning is a rite performed over ground that has not finished giving up its dead.
Continue reading
- News
Bosnia expels two Serbian embassy officials after they attend Ratko Mladić's funeral
Almanaque Digital DeskSarajevo
- News
Von der Leyen puts €200 million behind an EU-Greenland package in Nuuk
Almanaque Digital DeskNuuk
- News
DAC clears Rs 1.10 lakh crore of buys, 98 percent tagged for Indian firms
Almanaque Digital Desk