Defence council clears Rs 1.10 lakh crore of hardware, 98 percent from Indian firms
Rajnath Singh's DAC granted Acceptance of Necessity on 7 September for CBRN recce vehicles, mine layers, HAL Dhruv helicopters, Sarvatra bridges, Arudhra radars, marine gas turbines and ground jammers. AoN is the first administrative gate, not a signed contract. Sukhoi and helicopter upgrades are in the Air Force slice.

New Delhi2 min read
Last updated
The Defence Acquisition Council, chaired by Rajnath Singh, granted Acceptance of Necessity on 7 September for proposals worth about Rs 1.10 lakh crore across the Army, Navy and Air Force. The ministry said roughly 98 percent of that list is meant to be bought from Indian industry. AoN is the first administrative gate in the procurement rules. It is not a contract and it is not money leaving the treasury. It is the document that lets the services write a request for proposal.
The Army slice covers chemical, biological, radiological and nuclear reconnaissance vehicles that can detect and mark contaminated ground; high-mobility vehicles for poor roads; self-propelled mechanical mine layers; Advanced Light Helicopters built by Hindustan Aeronautics; trawl tanks with front-mounted gear that detonates mines to open a lane; and the Sarvatra bridging system for wet and dry gaps. The ministry said the helicopters will fly for both the Army and the Air Force across terrains and mission types.
The Navy slice has two named items. Arudhra radars will replace air-route surveillance radars at naval air stations. A marine gas turbine programme covers design, development and later purchase of a warship propulsion plant, written explicitly to cut reliance on foreign vendors. The Air Force slice was described in less detail: upgrades to raise the fighting value of fighters, including Sukhois, plus transport aircraft and helicopters. The council also cleared ground-based multi-purpose jammers against hostile radars and the Defence Forces Secure Access Card system.
Singh posted that the 98 percent domestic share shows a commitment to a defence industrial base. That claim is only as strong as the contracts that follow. Indian firms can receive an AoN and still import engines, seekers or radar modules. The marine gas turbine line is the honest test. India does not yet series-build a naval gas turbine of its own. The AoN starts that design clock. Years will pass before a hull puts to sea with an Indian core.
The list itself reads like a logistics and survivability package rather than a single platform splash. Mine layers, trawl tanks and bridges are tools for moving a force through ground that an opponent has prepared. CBRN recce vehicles assume a battlefield where chemical or radiological contamination is a planning factor. Jammers and new air-station radars assume an opponent with sensors. None of those lines makes a headline like a fighter order. Together they cost as much as one.
What to watch is the conversion rate. AoNs announced in previous years have sat in the pipeline while trials slipped. If HAL can put a defined number of Dhruvs against this paper in a published contract by the next fiscal year, the 98 percent line will mean something countable. If the marine turbine remains a design study in 2028, the same line will mean less. Rs 1.10 lakh crore is the ceiling the council accepted on Monday. The floor is whatever is actually signed.
Continue reading
- News
Von der Leyen puts €200 million on Greenland and says the island's future is not Washington's to decide
Almanaque Digital DeskNuuk
- News
Modi opens Global Fintech Fest citing 7.8 percent growth and a Japanese A-minus upgrade
Almanaque Digital DeskMumbai
- News
Haaretz says the UAE president warned Netanyahu before 7 October; his office calls it a lie